Home / Case studies / MTU 16V4000M70 complete overhaul
Case study · Major overhaul

MTU 16V4000M70 complete overhaul

Complete overhaul of an MTU 16V4000M70, from workshop strip-down and assembly through installation and sea trials in Papeete, Tahiti.

EngineMTU 16V4000M70
Nameplate rating2,320 kW at 2,000 rpm
Engine positionPort forward · MPE 4
LocationPapeete, Tahiti
WorkOverhaul, installation and sea trials

Project context

The engine was stripped down, cleaned, inspected and overhauled in a workshop in Papeete, following the OEM workshop manual. It was prepared to replace the vessel’s port forward main engine, MPE 4.

Components renewed

  • Crankshaft main bearings, connecting-rod big-end bearings and camshaft bearings
  • Pistons complete with rings and pins, and cylinder liners
  • High-pressure and low-pressure fuel pumps
  • Turbochargers, seals and gaskets

Cylinder heads and injectors

Cylinder heads and injectors were utilised from another engine. Before fitting, the heads were disassembled and inspected, the valves were lapped, and the heads were reassembled and pressure tested.

Documented assembly checks

The assembly report records component measurements, fits and clearances throughout the rebuild:

  • Crankcase main-bearing bores, bearing-cap fits, crankshaft journal dimensions and main-bearing clearances
  • Cylinder-liner fits and bores, piston measurements, connecting-rod bores, and big-end and small-end clearances
  • Camshaft bearing dimensions and clearances, gear-train backlash and axial clearances, and free-end gearcase bearing fit

Workshop start-up and sea trials

An initial engine start-up was carried out in the workshop before installation in the vessel’s port forward position. Sea trials were carried out following the OEM running procedure. Eight recorded operating points covered engine speeds from 612 to 1,960 rpm, with zero ECU failure codes recorded at those readings. The trial sheets document fuel, lubrication and cooling-system pressures and temperatures, turbocharger speeds and exhaust temperatures.

Overhaul build sequence

MTU 16V4000M70 overhaul — crankcase preparation
01 · Crankcase preparation
MTU 16V4000M70 overhaul — crankcase preparation
02 · Crankcase preparation
MTU 16V4000M70 overhaul — crankcase preparation
03 · Crankcase preparation
MTU 16V4000M70 overhaul — fitting main bearing for measurement
04 · Fitting main bearing for measurement
MTU 16V4000M70 overhaul — tightening main bearing caps for bearing measurement
05 · Tightening main bearing caps for bearing measurement
MTU 16V4000M70 overhaul — crankshaft installed into crankcase
06 · Crankshaft installed into crankcase
MTU 16V4000M70 overhaul — fitting main bearing caps
07 · Fitting main bearing caps
MTU 16V4000M70 overhaul — tightening main bearing caps
08 · Tightening main bearing caps
MTU 16V4000M70 overhaul — crankcase rolled over
09 · Crankcase rolled over
MTU 16V4000M70 overhaul — freeze fitting of gearcase main bearing
10 · Freeze fitting of gearcase main bearing
MTU 16V4000M70 overhaul — cylinder liners fitted
11 · Cylinder liners fitted
MTU 16V4000M70 overhaul — verification of flywheel housing alignment
12 · Verification of flywheel housing alignment
MTU 16V4000M70 overhaul — flywheel installation
13 · Flywheel installation
MTU 16V4000M70 overhaul — pistons and conrods ready for installation
14 · Pistons and conrods ready for installation
MTU 16V4000M70 overhaul — installing driver flange
15 · Installing driver flange
MTU 16V4000M70 overhaul — gearcase with driver flange fitted
16 · Gearcase with driver flange fitted
MTU 16V4000M70 overhaul — pistons fitted
17 · Pistons fitted
MTU 16V4000M70 overhaul — fitting cylinder heads
18 · Fitting cylinder heads
MTU 16V4000M70 overhaul — cylinder heads fitted
19 · Cylinder heads fitted
MTU 16V4000M70 overhaul — exhaust manifolds fitted
20 · Exhaust manifolds fitted
MTU 16V4000M70 overhaul — rocker gear, pumps and filter housing fitted
21 · Rocker gear, pumps and filter housing fitted
MTU 16V4000M70 overhaul — Geislinger coupling assembly
22 · Geislinger coupling assembly
MTU 16V4000M70 overhaul — Geislinger coupling assembly
23 · Geislinger coupling assembly
MTU 16V4000M70 overhaul — charge air coolers and carrier housing fitted
24 · Charge air coolers and carrier housing fitted
MTU 16V4000M70 overhaul — checking camshaft timing
25 · Checking camshaft timing
MTU 16V4000M70 overhaul — turbochargers fitted
26 · Turbochargers fitted
MTU 16V4000M70 overhaul — engine assembly with oil cooler fitted
27 · Engine assembly with oil cooler fitted
MTU 16V4000M70 overhaul — high-pressure fuel lines fitted
28 · High-pressure fuel lines fitted
MTU 16V4000M70 overhaul — initial startup and testing of engine in workshop
29 · Initial startup and testing of engine in workshop

Completed overhaul and installation

MTU 16V4000M70 ready for installation after a complete overhaul in Papeete
MTU 16V4000M70 ready for installation after a complete overhaul in Papeete
MTU 16V4000M70 being installed after its complete overhaul
MTU 16V4000M70 being installed after its complete overhaul